4 Tips To Generate Ideas For Art

The trick to write a critique essay

Process of creation of fixed assets, having begun in branches of the heavy industry, comes to the end with construction branch, providing realization of technological unity of active and passive parts of fixed assets, their economic merge.

The natural and material maintenance of the fixed business assets is made by the buildings and constructions equipped with the processing and other equipment made by branches of mechanical engineering which installation is carried out also in the course of construction.

02 – the coefficient considering the size of a reserve of funds for unforeseen works and expenses to basic estimated cost of SMR and other expenses of the contractor on a result of chapters 1-9 of summary budget calculation of cost of construction.

Summary calculation of the additional actual expenses caused by influence of market conditions of implementation of construction and included in DTs over the contract works considered by standard extra charges in basic cost.

Production of capital construction are the production objects, and also objects of non-productive appointment which are put into operation and accepted in operation (including new construction, reconstruction and capital repairs). In process of input they become fixed assets.

Special conditions of construction: a construction of engineering networks and constructions in the constrained conditions of the built-up part of the city. (The norm of expenses of work, the main ZP of workers, costs of operation of cars and mechanisms and ZP of the workers serving machines and mechanisms are corrected by the raising coefficient

Summary calculation of the additional actual expenses caused by influence of market conditions of implementation of construction and included in DTs over the contract works considered by standard extra charges in basic cost. 26

In the price of construction production receive reflection socially necessary costs of production of construction production counting on a spending unit of measurement, including an expense of all types of resources and costs of their acquisition, processing and use in the course of an object construction.